LED Driver LED Power Supply 12V 360W AC DC Switching Power Supply,

1:COMPANY GATE2:LED POWER SUPPLY WORKPLACE3:ABOUT OUR PRODUCTOR12V-360 LED POWER SUPPLY 12V-100W LED POWER SUPPLY  4:Specifications Model                 SpecificationD-120 AD-120 BDC Output Voltage24V12V12V24VIutput Voltage

Featured Products


1:COMPANY GATE

LED Driver LED Power Supply 12V 360W AC DC Switching Power Supply,


2:LED POWER SUPPLY WORKPLACE

LED Driver LED Power Supply 12V 360W AC DC Switching Power Supply,

3:ABOUT OUR PRODUCTOR


LED Driver LED Power Supply 12V 360W AC DC Switching Power Supply,
12V-360 LED POWER SUPPLY
 





LED Driver LED Power Supply 12V 360W AC DC Switching Power Supply,
12V-100W LED POWER SUPPLY 


 

4:Specifications
 

Model                 SpecificationD-120 AD-120 B
DC Output Voltage24V12V12V24V
Iutput Voltage Error± 2%± 6%± 2%± 7%
Rated Output Current20A30A20A30A
Output Current Range2-10.4A2-155A2-10A2-10.5A
Tripple and Noise60mVp-p120mVp-p60mVp-p150mVp-p
Iniet Stability± 0.5%± 1%± 0.5%± 1%
Tolerance Voltage± 0.5%± 5%± 0.5%6%
DC Output Power351W347W
Efficiency89%88%
Adjustable Range for DC Voltage  
 110VAC/170~264VAC selected by switch 47~63Hz; 240~370VDC
Input Current2.5A/115V    1.25A/230V
AC Inrush CurrentCold-Start Current: 35A/115V, 35A/230V
Leakage Current<3.5mA/240VAC
Overload Protection105%~150%   Type: Foldback Current Limiting, Reset: Auto Recovery
Over Voltage Protection......
High Temperature Protection......
Temperature Coefficient± 0.03% /ºC (0~50ºC)
Start, Rise, Hold time200ms, 50ms, 30ms
Vibration10~500Hz, 2G 10min,/1cycle, a total of 60 minutes, Each axes
Withstand VoltageBetween Input and Output: 1.5KVAC, Input and Shell: 1.5KVAC, Output and Shell: 0.5KVAC
Isolation ResistanceInput and Output Intermal: Input and Enclosute, Output and Enclosure: 500VDC/100M Ohms
Working Temperature and Humidity`-10ºC~+60ºC (Refer to Output Derating Cutve), 20%~90%RH
Storage Temperature and Humidity`20ºC~+85ºC, 10%~95%RH
Overall Dimension84*47*30 mm
Weight0.95 kgs
Safety StandardsCE
EMC StandardsMeet FCC Part 15J Conduction class B
                                     
  5: FAQ
 

 Question 1: What is your payment term?

         Answer: T/T 30% in advance and balance 70% before shipment or L/C at sight.

 

Question 2: What is your delivery term?

         Answer: EXW, FOB, CFR, CIF

 

Question 3: What about Lead time?

        Answer: normally, it takes about 7 to 30 days after receiving your advance payment.

 

Question 4: Can you produce according to our samples?

       Answer: Yes, we can produce according to your samples or technical drawing, we will make the molds and fixtures.

 

Question 5: What is your sample's policy?

       Answer: We provide the sample according to your requirements, and you get to pay the sample's fee and courier freight, we will return the sample fee to you once you confirm the normal order.

 

Question 6: Do you test all your goods before delivery?

      Answer: Yes, we have 100% test before delivery.

 

Question 7: How do you make our business longterm and good relationship?

     Answer: Firstly, we provide good quality products with competitive price, to ensure our customer's benefit;

                     Secondly, we respect our customers as our friends, grow up together.

                                     

  THANKS AGAIN YOU CAN COME HERE

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours